Friday 17 April 2015



Ultra Modern Administrative Block Under Construction in NPB
By Atemkeng Sylvester, Tosam Carine and Neba Yvonne  
National Polytechnic Bamenda will in the days ahead be a proud owner of an ultra modern two floor administrative block in its Bambui campus. The administrative block presently under construction, promises to be an architectural master piece and will go a long way to salvage the inadequate office space for lecturers.
According to Mamman Haruna Danabe, Officer in Charge of Missions in NPB, the construction of this administrative block is the realization of late Bobe Yong Francis Nkwain’s dream.
He went further to explain that the block is more or less a replica with modifications of the North West Governors office building.
“The late proprietor actually took a team to the Governor’s office so that they could have a model with some modifications and not just a replica” he observed.
Mamman Haruna Danabe also revealed that everything being equal, the building that is architectural master will be out to use in April 2015 at the most.
The modern structure will harbor the central administration, offices of the deans of the various schools and some offices for lecturers.
 


The building as at now

 

The building upon completion